Bimefy is a construction site intelligence platform. It connects BIM, construction planning, cameras, reality capture and site data so teams can compare what was planned with what is actually happening on site.
Oracle Primavera P6 is where many contractors build and maintain the construction programme: the work breakdown structure, the activities, the durations, the logic and the milestones that the project is measured against.
Bimefy connects to Primavera and brings activity data into the project. Schedules can be connected through the Primavera API, and programmes exported as XER or MS Project files can be imported directly, which is often the faster route when the schedule is maintained by a separate planning team.
Once activities are in Bimefy they can be linked to model components and to captured site evidence. That link is what turns a programme into something verifiable: an activity is no longer just a bar on a chart, it points at the part of the building it describes and at the imagery showing that part today.
Primavera remains the scheduling environment. Bimefy does not re-plan the works or replace the programme; it adds the reality and model context around it.
What connecting Primavera to Bimefy gives a project team.
Connect a Primavera environment and select the workspace and project whose activities should be brought into Bimefy.
Activities, the work breakdown structure and planned dates are read into Bimefy so the programme is visible next to the model and the site.
Where a live connection is not practical, import an exported XER or MS Project programme instead and keep the outline structure intact.
Set planned activities against captured site progress to see where the work on the ground is ahead of, behind or in line with the programme.
Link activities to model components so the construction sequence can be reviewed against the model rather than read off a bar chart.
Track milestone activities and flag the ones that have passed their date, with captured site evidence attached.
From programme to a comparison you can act on.
Connect your Primavera environment, or upload an exported XER or MS Project programme.
Bring the work breakdown structure, activities and planned dates into the Bimefy project.
Associate activities with the model components they describe, so the programme has a physical location.
Set the programme against captured site progress and review where actual work differs from the plan.
Concrete planning workflows this combination supports.
Take the activities that should be complete this week and check them against the most recent captures of the same location.
Combine model components with planned activity dates to review the construction sequence before and during the works.
Support progress reporting with captured site evidence instead of relying on a percentage entered by hand.
When a milestone is claimed, attach the captures of that area from the relevant date to the record.
Primavera is built to plan and maintain a construction programme at scale. It describes what should happen, in what order, and by when. What it cannot do on its own is confirm whether the site agrees.
Bimefy brings the other two inputs: the model, which says what the work physically is, and reality capture, which shows what has been built. Connect a programme to those and every activity gains a location and a piece of evidence.
The planning team keeps working in Primavera. The difference is that progress reported back into the programme can be checked against the site rather than taken on trust.
Roles that get the most out of this integration.
Other systems Bimefy connects with
Import construction schedules into Bimefy and export updated planning data for use in Microsoft Project.
View integrationBring Autodesk models, folders and file versions into Bimefy, and compare them with captured site reality.
View integrationConnect a Qonic account and keep synced models in Bimefy next to captured site reality.
View integrationConnect your own cameras, capture pipelines and sensor systems to Bimefy with scoped API tokens.
View integrationSee how Bimefy can connect your existing construction systems and turn site data into project intelligence.








Trusted by innovation driven companies